Available Land and Buildings
Arrow Ridge Business Park
- A 160-acre business and industry park with easy connections to water, sewer, natural gas, and electricity
- Easy access to WIS Highway 129.
- Up to 1 Gig Internet available
- 500,000 gallon Water Tower in the business park for good domestic water service and available fire flow
-
Wastewater (Lancaster Wastewater Treatment Facility)
City engineers estimate the following additional capacity, based on average data for the last 3 years from Saputo. Larger volumes and loadings might be possible on a case-by-case basis.
- Wastewater volume: 50,000 gallons per day
- Total suspended solids: 47 pounds/day
- BOD: 225 pounds/day
- Total phosphorus: 2 pounds/day
For general wastewater requirements, please see Chapter 355 of City of Lancaster ordinances.
- Regional stormwater management for detention and treatment
-
Electricity (Alliant Energy)
- 3-phase looped power, 3.5 megawatts readily available. Alliant can discuss additional capacity arrangements based on exact load needs.
-
Natural Gas (WE Energies)
- Meter capable of providing up 6,000 SCFH (6 million BTUs/hour). 5 PSIG.
- 4-inch PE service lateral on 4-inch PE main.
- For projected loads greater than 10 SCFH, We Energies will want to review the request before committing to what is available. For projected loads greater than 6,000 SCFH, WE may need to replace only the meter.
- Fire Protection Insurance Services Office (ISO) Rating of 3
- BIPD Zoning https://ecode360.com/27380767
Golf Course Commercial Development
Downtown
Highway Commercial